Projects

Westgate Freeway

Heinz / Langtech

Construction Value: $14,193,400

Completion Date: October 2014

Description:
Design and Construction of industrial beverage processing plant. Including, civil, electrical, water filtration processing, cooling/heating, hydraulic and water-recycling waste management systems.




Westgate Freeway

Westgate Freeway Upgrade Management Systems

Construction Value: $63,695,000

Completion Date: April 2014

Description:
Working in conjunction with state government body VicRoads, for the construction of a 'state of the art' traffic management system for the Westgate Freeway (spanning over 8kms). Including, the installation of 23 overhead variable speed limit gantries, 41 concrete deflection barriers, electrical traffic data collection/processing systems and traffic monitoring cameras.




Westgate Freeway

Episcopate of the Romanian Orthodox Australia and New Zealand

Construction Value: $3,134,600

Completion Date: April 2014

Description:
Design and Construction of modern 12 bedroom, 4 bathroom dormitory and conference complex area.




Westgate Freeway

Heinz / Langtech

Construction Value: $18,467,800

Completion Date: June 2014

Description:
Upgrading of repurposed, unused, section of an existing industrial beverage processing plant. Including civil, electrical, water filtration processing, cooling/heating, hydraulic and water recycling waste management systems.




Westgate Freeway

Regional Rail Link

Construction Value: $28,295,000

Completion Date: December 2013

Description:
Working in conjunction with the Victorian Government in order to design, construct and install a new inner city, pre-fabricated railroad bridge. The railroad bridge was comprised of 16 bridge decks (18m long x 3m wide), 4 spans in width and length.




Westgate Freeway

Regional Rail Link

Construction Value: $8,138,000

Completion Date: March 2013

Description:
Working in conjunction with the Victorian Government in order to design, construct and install 32 retaining walls (8m high, 4m wide, 12m long). The retaining walls were constructed to accommodate the development of a railroad bridge in the vicinity of an arterial road.




Westgate Freeway

Regional Rail Link

Construction Value: $19,656,100

Completion Date: January 2013

Description:
Working in conjunction with the Victorian Government in order to design, construct and install a new inner city, pre-fabricated railroad bridge. The railroad bridge was comprised of 3 bridge decks (32m long x 8m wide), 2 spans in width and length.




Westgate Freeway

Melbourne Zoo

Construction Value: $4,039,000

Completion Date: August 2012

Description:
Design and construction of state of the art Meerkat enclosure.




Westgate Freeway

Boral Plaster Board Factory

Construction Value: $42,956,700

Completion Date: February 2012

Description:
Construction and upgrade of shipping port terminal and Boral gypsum processing plant. Including construction a conveyer belt in between the Boral factory and existing Port Melbourne Docks, in an effort to improve productivity. As well as the construction of the new gypsum processing plant (10,000 m² in floor area), which included civil/structural components, electrical and drainage components and fit out.




Westgate Freeway

Red Alert Safety Training

Construction Value: $18,456,000

Completion Date: April 2011

Description:
Design and Construction of HUET training facility, including the construction of 3 heated swimming pools (20 m diameter, 6 m height, 1.9 ML capacity) and employee amenities facilities. Including the installation of roof stormwater harvesting, water recycling and hydraulic systems.




Westgate Freeway

Visionstream

Construction Value: $8,343,2000

Completion Date: August 2010

Description:
Working in conjunction with state government body VicRoads and Visionstream, in order to construct a modern traffic management system for the Westgate Freeway. Including the installation of 3 overhead variable speed limit gantries, 9 concrete deflection barriers, electrical traffic data collection/processing systems and traffic monitoring cameras.




Westgate Freeway

United Group Limited

Construction Value: $17,467,800

Completion Date: October 2010

Description:
Working in conjunction with state government body and United Group, in order to construct a modern rail management system for the Westall rail link upgrade. This included the installation of 9 overhead variable signalling gantries, electrical data collection/processing systems and respective civil works.




Westgate Freeway

Bayside City Council

Construction Value: $2,768,000

Completion Date: March 2010

Description:
Working in conjunction with the Bayside City Council in order to design, construct and installation of 12 retaining walls (6m high, 3m wide, 8m long).




Westgate Freeway

Rio Tinto

Construction Value: $21,457,000

Completion Date: September 2009

Description:
Construction of overland coal conveyer civil works, spanning over 13 kilometres. Including road construction, accompanying concrete structures (4 x rail culverts and 4 x haul road trestle bridges at 9m high) and 2,600 concrete bedding sleepers.




Westgate Freeway

John Holland Civil

Construction Value: $14,456,800

Completion Date: January 2009

Description:
Working in conjunction with the Victorian Government and John Holland, in order to construct a Pilot Plant for the Victorian Desalination Plant. This 'Greenfields' project included civil, structural, hydraulic, reverse osmosis water filtration and electrical monitoring systems.




Westgate Freeway

Baw Baw Shire

Construction Value: $12,354,600

Completion Date: August 2008

Description:
Construction of concrete bridge (6m wide and 23m span), construction of Visitors Centre including tourist public toilets, car park ( 5,000 m² surface area) and associated road works.




Westgate Freeway

Rans Electrical

Construction Value: $7,687,000

Completion Date: September 2007

Description:
Construction of 2 x 65 MWt transformer housing facilities, including civil and structure works with supporting rock drilling earthing (243 x 40mm DIA at 60m deep).




Westgate Freeway

Thiess Services

Construction Value: $23,454,000

Completion Date: November 2007

Description:
Working in conjunction with state government for the construction of a trial Water Treatment Plant, where wastewater receives tertiary treatment. Included civil, structural, hydraulic, electrical, water filtration and treatment systems.




BOC Gas

BOC Gas

Construction Value: $12,345,000

Completion Date: August 2007

Description:
Construction of Oxygen Compressor Building, included civil, blast proof structural concrete and steel, acoustic noise suppression, hydraulic and electrical works.